Project reference for Estonia Factory Solar-Plus-Storage Project

Factory solar-plus-storage system

Estonia Factory Solar-Plus-Storage Project

A 1.5 MW / 3 MWh containerized battery energy storage system supporting a customer's factory in Estonia and integrated with 5 MW of photovoltaic generation.

1.5 MW / 3 MWh BESS · 5 MW PV · Estonia

Project overview

Application context and system requirements.

This project supports the electricity requirements of a customer’s factory in Estonia. Its scope combines a 1.5 MW / 3 MWh containerized battery energy storage system with 5 MW of photovoltaic generation, forming a site-specific solar-plus-storage solution.

Case record

Project requirements and system scope.

  1. 01
    Customer challenge

    Support the electricity requirements of the customer's factory in Estonia.

  2. 02
    System scope

    A 1.5 MW / 3 MWh containerized battery energy storage system integrated with 5 MW of photovoltaic generation.

Have a similar requirement?

Start with the load, site and project stage.

Discuss your project

Tell us what you are building.

Share your application and requirements so our team can prepare for a technical discussion.

Discuss your project